EasyManua.ls Logo

ABB IRB 5720 - Page 331

ABB IRB 5720
610 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
xx2100002186
Lower the motor into position.
Make sure that the motor pinion is properly
mated to the gear in the gearbox.
Make sure that the motor pinion does not
get damaged.
Make sure that the direction of the cable
gland exit is facing the correct way.
6
Hex socket head cap screw:
M10x30 12.9 Gleitmo 603+Geomet
500 (4 pcs)
Secure the motor with its attachment screws and
washers.
Use a bits extender to reach the screws.
7
Bits extender: 3HAC12342-1
Tightening torque: 50 Nm.
xx2100000503
Disconnect the brake release tool.8
See Performing a leak-down test
on page 188.
Perform a leak-down test (if not already done).9
Inverted robot: Attaching the motor lifting accessory
Note
This procedure is valid for inverted robots.
Continues on next page
Product manual - IRB 5720 331
3HAC079195-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.8.1 Replacing the axis-1 motor
Continued

Table of Contents

Related product manuals