EasyManua.ls Logo

ABB IRB 5720 - Page 531

ABB IRB 5720
610 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Hex socket head cap screw : M10x40 12.9
Gleitmo 603+Geomet 500 (27 pcs ).
xx2100002449
Slide the gearbox into position and fit the
attachment screws and washers.
4
xx2100002446
Remove the guide pins and fit the remain-
ing attachment screws and washers.
5
Tightening torque: see standard torque in
Screw joints on page 592.
Tighten the attachment screws.6
Preparations before refitting the upper arm
NoteAction
Wipe clean all contact surfaces.1
Guide pin, M12x150: 3HAC13056-2Fit two guide pins in opposite M12 holes
in the axis-3 gearbox.
Tip
Lubricate the guide pins with some grease
to make the upper arm slide better.
2
Always use guide pins in pairs.
xx2100002445
Continues on next page
Product manual - IRB 5720 531
3HAC079195-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.9.3 Replacing the axis-3 gearbox
Continued

Table of Contents

Related product manuals