EasyManua.ls Logo

ABB OmniCore C90XT - Page 126

ABB OmniCore C90XT
450 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Note/IllustrationAction
xx1900001879
Pull the cable ties out from the locking
holes.
2
xx1900001880
Remove the screws and lift out the robot
signal exchange proxy.
3
Installing the DeviceNet board
Note/IllustrationAction
Location of wrist strap button:
ELECTROSTATIC DISCHARGE
(ESD)
When handling the computer outside of
the controller, use the wrist strap button
located on the side of the computer.
1
xx2000000419
Continues on next page
126 Product manual - OmniCore C90XT
3HAC073706-001 Revision: D
© Copyright 2020-2021 ABB. All rights reserved.
3 Installation and commissioning
3.7.6 Installing the fieldbus master
Continued

Table of Contents

Related product manuals