EasyManua.ls Logo

ABB OmniCore C90XT - Page 239

ABB OmniCore C90XT
450 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Reconnecting the connectors to the main computer assembly
Note/IllustrationAction
DANGER
Before doing any work inside the cabinet,
disconnect the mains power. For more
information, see Electrical safety on
page 31.
1
Location of wrist strap button:
ELECTROSTATIC DISCHARGE
(ESD)
When handling the computer outside of
the controller, use the wrist strap button
located on the side of the computer.
2
xx1900001446
Reconnect all the connectors on as-
sembly of the robot signal exchange
proxy, ethernet extension-seven port
switch (option), ABB ability™ connected
services, scalable I/O digital base (op-
tion), and main computer.
3
For the robot signal exchange proxy:
K2.X8 - A2.X6
(option): K2.X2 - K4.X8, A2.X1
K2.X12 - A2.K3.X6, A2.K3.X7
K2.X10 - A1.X13
K2.X21 - TempSensor (G3.TEMP)
K2.X4 - A1.X9
K2.X3 - K6.X1, A2.K3.X1, K5.1.X4,
K7.X1
K2.X1 - T2.X2
K2.X17 - G3.X1, G1.X2
K2.X6, K2.X11 - A1.X2
K2.X7, K2.X22 - Harn. LV robot
power (X1)
K2.X9 & X13 - FlexPendant (X4)
For the Ethernet extension switch:
K2.X2 - K4.X8, A2.X1
K4.X7 - K5.1.X5
K4.X6 - A2.X4
Continues on next page
Product manual - OmniCore C90XT 239
3HAC073706-001 Revision: D
© Copyright 2020-2021 ABB. All rights reserved.
5 Repair
5.2.8 Replacing the main computer
Continued

Table of Contents

Related product manuals