Page #101 background imageLoading...
Page #101 background image
Start-up 99
8
Start-up
Contents of this chapter
This chapter describes the start-up procedure of the inverter. It also gives some advice for
operation.
Start-up procedure
The functioning of the inverter is first tested in the local control mode with the control panel
(CDP312R). Thereafter, the control program parameters are set. The start-up procedure is
described step-by-step in the table below.
SAFETY
WARNING! Obey the safety instructions during the
installation and start-up procedure. See chapter Safety
instructions.
Only qualified electricians are allowed to install and start-up the
inverter.
PRIMARY AND AMBIENT CONDITION CHECKS
Check that the mechanical and electrical installation of the
inverter is OK. See chapter Installation checklist.
Check that the insulation of the assembly is OK. See section
Checking the insulation of the assembly, page 83.
Note: If the insulation is not OK, the
optional insulation resistance
monitoring (option +Q954, +Q976 or
+Q981) cannot be tuned properly.
Check that the ambient conditions for start-up, temperature and
humidity level is within the limits. See section Ambient conditions,
page 144.
Note: Depending on the humidity level or temperature, it can be
necessary to use cabinet heaters continuously for a longer time
before start-up.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB PVS800-57-0100kW-A and is the answer not in the manual?