Installation Section 4
4-6 Abbott VP 2000™ Proceessor Service Manual
30-608308/R1—September 2008
Site Inspection
System Hardware Installation – Instrument
System Hardware Installation – SCC, Monitor, Printer & Stand
System Hardware Installation – Cables
Task Reference Complete
Pre-installation inspection checklist obtained
and reviewed
Pre-installation Checklist in this section
Task Reference Complete
Instrument unpacked Section 4, Instrument Installation,
Instrument Setup
Instrument placed on lab bench Section 4, Instrument Installation,
Instrument Setup
Unpack accessories Section 4, Instrument Installation,
Instrument Setup
Installing Fluid-Flow Lines Section 4, Instrument Installation,
Installing Fluid-Flow Lines
Connecting the Power Section 4, Instrument Installation,
Connecting the Power
Task Reference Complete
PC, monitor, and printer unpacked Section 4, Instrument Installation, PC
Setup
Correct PC voltage verified Section 4, Instrument Installation, PC
Setup
Task Reference Complete
Cables connected to PC Section 4, Instrument Installation, PC
Setup
Power cords of the PC, monitor, and printer
connected to the power outlet
N/A
Power cord between the instrument and
power outlet connected
N/A