Section 4 Abbott VP 2000 Processor Installation Checklist
Abbott VP 2000™ Processor Service Manual 4-7
30-608308/R1—September 2008
System Software Installation
Verification of Installation
Task Reference Complete
Software installed properly Latest TSB/ISA
Communication between PC and
instrument verified
Section 4, Instrument Installation,
Installation of Instrument Software
Task Reference Complete
Initial Power Up sequence Section 4, Troubleshooting, Built-In Test,
Purpose of the Test, Step 2
Verify Dryer temperature is achieved Abbott VP 2000 User Guide, Section 6,
Service and Maintenance, Manually
Changing Dryer Station Temperature
Verify that Heater Module Basins achieve
temperature in 30 minutes. Use water in the
Heater Basin Vessels for test purposes.
Abbott VP 2000 User Guide, Section 4,
Routing Operations, Manually
Controlling the Basin Heaters
Execute the VP2KQC.vp2 program to verify
the Robotic Arm move to every location on
the instrument.
Abbott VP 2000 User Guide, Section 6,
Service and Maintenance, Running a
Robotics Test