Adept Python Modules User’s Guide, Rev. E 161
Advanced System
Configurations 12
12.1 Description
The installation drawing in Figure 12-1 on page 162 shows the cable connections for a
system with two 2-axis linear module robots running on one SmartController.
The installation drawing in Figure 12-2 on page 163 shows the cable connections for a
system with three 2-axis linear module robots and two PDUs running on one
SmartController.
The installation drawing in Figure 12-3 on page 164 shows the cable connections for a
system with three 2-axis linear module robots, two PDUs, and a Cobra s600 with Vision,
running on one SmartController.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com