© Agilent Technologies 1989–2002 Agilent 3070 / 79000 Site Preparation 10-6
Chapter 10: Site Preparation – Power Requirements for Older Systems: Series 3 Power Requirements and Connections (Prior to May 2001)
Table 10-1 Series 3 and 79000 family power requirements (3-phase power)
E1135C Power Option Voltage Full-Load Amps (FLA)
1
for:
2
327X 79000
3
317X 307X 3-phase
xDSL/POTS
Bay
1-phase
xDSL/POTS
Bay
4
Opts/Current
3-Phase Wye w/ Neutral AWW
5
120 / 208 13 14 18 24 12 AWV, 16
05E
5 or 6
127 / 220 13 14 18 24 12 AWZ, 16
0E5
6
220 / 380 9 10 10 16 10 05M, 14
05L
6
230 / 400 9 10 10 16 10 05F, 14
0E7
6
240 / 415 9 10 10 16 10 05J, 14
3-phase Delta 0ED
6
200 1314182412 AWY, 16
05C
5 or 6
220 1314182412 0E3, 16
05H
5 or 6
230 1314182412 03G, 16
0E6
5 or 6
240 1314182412 0EH, 16
1. Calculated with a fully-loaded 3X7X system with 3 STC cards in every module.
2. DUT Power supplies are configured for 200-240 volts ac.
3.
Calculated with 6 STC cards in the module.
4.
POTS and xDSL bays always require a separate power drop. Use the POTS/xDSL power option that is on the same line as the E1135C power option.
5.
Use E1135-61611 power cord with NEMA L21-30 receptacle/connector body.
6.
Use E1135-61610 power cord with IEC 60309 32A 3-phase receptacle/connector body (included with the system)
L1
L
L2
N
G
L1
L3 L2
G