EasyManua.ls Logo

Agilent Technologies 3070 Series - User Manual

Agilent Technologies 3070 Series
410 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Agilent 3070 / 79000 Board Test
Systems
Site Preparation
June 2002

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 3070 Series and is the answer not in the manual?

Agilent Technologies 3070 Series Specifications

General IconGeneral
BrandAgilent Technologies
Model3070 Series
CategoryTest Equipment
LanguageEnglish

Summary

Emergency Shutdown

Emergency Shutdown Switch (EMO)

The Emergency Shutdown Switch turns off all AC and DC power to the testhead in an emergency.

Warranty

Agilent 3070; 79000 BOARD TEST SYSTEMS 1-YEAR

Details the one-year warranty covering hardware repair, software support, and updates.

Warnings

General Safety Precautions

General precautions for operation, service, and repair to prevent hazards.

1 Site Preparation - Process

Responsibilities

Summaries of Agilent's and Customer's responsibilities for system preparation and installation.

2 Site Preparation - System Overview

System Overview

Presents information to help understand the parts of the 3070 and 79000 families of board test systems.

Testhead

Connects to DUT; measurement hardware in card cages called 'modules'.

Controller

Manages system operations; HP 9000 Series controllers used for 3070/79000.

3 Site Preparation - Planning

Choosing The Site

Considers system-dependent and system-independent criteria for selecting a location.

The System Plan Drawing

Details power availability, cabling, air/vacuum lines, and placement for installation.

Assigning Specialists

Assigns specialists for preparatory tasks like site coordination, structural, and environmental verification.

4 Site Preparation - Structural Requirements

Floor Requirements

Covers system weights, point floor loading, and anti-static surface requirements.

5 Site Preparation - Environmental Requirements

Air Quality Requirements

Discusses corrosive, particulate, and viscid contaminants and their impact on system reliability.

Air Temperature Requirements

Provides temperature and cooling requirements for reliable system operation.

6 Site Preparation - Power Requirements

7 Site Preparation - Compressed Air and Vacuum Requirements

8 Site Preparation - Communications Cabling Requirements

9 Site Preparation - Receiving and Moving Instructions

10 Site Preparation - Power Requirements for Older Systems

11 Site Preparation - Series 3; 79000 Current Reduction Conversion

Related product manuals