© Agilent Technologies 1989–2002 Agilent 3070 / 79000 Site Preparation 10-9
Chapter 10: Site Preparation – Power Requirements for Older Systems: Series 3 Power Requirements and Connections (Prior to May 2001)
Series 3 / 79000 Power Distribution
To move a system to a location that requires a different
power option, you may need to reconfigure the PDU and
change where equipment is plugged in.
Find the section in
Table 10-3 on page 10-10 (3-phase
power) or
Table 10-4 on page 10-13 (single-phase
power) that describes:
■ Your new system power option
■ System type (the number of modules)
■ Location of outlets
■ Number of PDUs, as well as the figure page
number which describes your power option wiring