Chapter 10: Site Preparation – Power Requirements for Older Systems: Series 3 Power Requirements and Connections (Prior to May 2001)
Series 3 / 79000 Power Distribution
To move a system to a location that requires a different
power option, you may need to reconfigure the PDU and
change where equipment is plugged in.
Find the section in
Table 10-3 on page 10-10 (3-phase
power) or
Table 10-4 on page 10-13 (single-phase
power) that describes:
â– Your new system power option
â– System type (the number of modules)
â– Location of outlets
â– Number of PDUs, as well as the figure page
number which describes your power option wiring