© Agilent Technologies 1989–2002 Agilent 3070 / 79000 Site Preparation 10-80
Chapter 10: Site Preparation – Power Requirements for Older Systems: Series 3 Power Requirements and Connections (Prior to May 2000)
Series 3 / 79000 Power Requirements
This section provides minimum power requirements for
Agilent 3070 / 79000 Series 3 family systems for serial
numbers shown in
Table 10-5 and Table 10-6 on
page 10-79. For most installations, these requirements
are sufficient.
NOTE
For new 3070 / 79000 Series 3 systems, go to
Table 10-1 on page 10-6.
NOTE
The loading and wire size information shown
beside the values in brackets [ ] in tables in this
chapter applies to 3070 / 79000 Series 3 systems
which shipped after June 1999, (
Table 10-5) or to
systems reconfigured to match those which
shipped after June 1999.
Series 3 systems shipped prior to June 1999
(
Table 10-6) can substantially reduce their current
requirements, as shown by comparing the values
shown in brackets [ ] in the tables with the values
beside them which are not shown in brackets. The
reduced current requirements can be achieved by
following the recommendations in Chapter 11,
Site Preparation – Series 3 / 79000 Current
Reduction Conversion of this manual.
See Chapter 10,
Site Preparation – Power
Requirements for Older Systems for Series I, II
power requirements. See the
3070 / 79000 Repair
Manuals, Chapter 1B for the locations where
instruments are plugged in for load balancing for
Series II and Series 3.