© Agilent Technologies 1989–2002 Agilent 3070 / 79000 Site Preparation 10-81
Chapter 10: Site Preparation – Power Requirements for Older Systems: Series 3 Power Requirements and Connections (Prior to May 2000)
The 3070 / 79000 family systems with serial numbers
shown in
Table 10-5 on page 10-79 (3-phase) and Table
10-6 on page 10-79 (single-phase) require ac electrical
power supplied two ways:
1 AC mains power must be supplied to the system’s
Power Distribution Unit (PDU).
2 For 327X / 79000 systems using wire and breaker
option #AWW, a power cord is supplied already
wired to the PDU; these are the only systems shipped
before May 2000 supplied with a power cord.
Figure 10-62 Opt. #AWW power plug
Agile nt makes the f ollowing rec om- mendations:
Ground
Neutral
30 A 120/208 V 3-phase male plug
Part number for cord and plug - E1135-61611 for
orth America and E1135-61610 internationally.
Cord is Hard Service (SO) Multi-Strand AWG 12/5
Mating receptacle is a NEMA# L21-30
208Plug-20Amp.wpg