© Agilent Technologies 1989–2002 Agilent 3070 / 79000 Site Preparation 1-7
Chapter 1: Site Preparation – Process: Site Prep Checklist
Chapter 5, Site Preparation –
Environmental Requirements
[ ] Air quality suitable?
[ ] Ambient temperature suitable?
[ ] Cooling sufficient?
[ ] Humidity suitable?
[ ] Electromagnetic environment suitable?
Chapter 6, Site Preparation –
Power Requirements
System Power
What power option is your system? Opt. ______
[ ] AC mains power verified?
[ ] Mains disconnect
1
installed if the system does not have an E1135C PDU?
[ ] Do you need to install power conditioning equipment?
[ ] Do you need to install a new transformer?
[ ] What system drop wire size is required? Wire Size ______
[ ] What system drop breaker size is required? Breaker Size ______
[ ] Power cable installed for mains?
Connect Mains Power
[ ] Power installed to system?
Convenience Outlet Power
[ ] Testhead strip printer?
[ ] Testhead server?
Table 1-1 Site preparation checklist (continued)
Task Checklist