© Agilent Technologies 1989–2002 Agilent 3070 / 79000 Site Preparation 10-158
Chapter 10: Site Preparation – Power Requirements for Older Systems: Connecting Mains Power To The System
NOTE
The voltage selector switch (S1) inside the PDU
DOES NOT set the output voltage of the PDU. It
sets the PDU’s remote shutdown circuitry for the
appropriate input voltage range: 100–127 volts or
200–240 volts.
See the
E1135C Power Distribution Unit Manual,
E1135-90001, for the switch location.
NOTE
For all of the power options set the Voltage
Selector switch (S1) on the Control Board to
‘230V’.