GC-MS Features 9
Operation Manual 135
To Manually Prepare the GC for Venting the MS
If using an MS that does not communicate events to the GC
(beyond a simple start/stop), you can still prepare the GC
for venting by loading the MS Vent method. To manually load
the MS Vent method:
1 Press [Method], scroll to MS Vent, and press [Load].
2 When prompted, press [On/Yes] to confirm.