EasyManua.ls Logo

Agilent Technologies Agilent 7890 Series

Agilent Technologies Agilent 7890 Series
354 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
136 Maintaining Your GC
8 Maintaining the MMI
14
Condition the column per the manufacturer’s
recommendation. (See To Condition a Capillary Column.)
15 Install the column into the detector. See:
To Install a Capillary Column in the FID
To Install a Capillary Column in the NPD
To Install a Capillary Column in the TCD
To Install a Capillary Column in the uECD
To install a Capillary Column in the FPD Plus
To Install a Capillary Column Adapter in the FPD
16 After the column is installed at both inlet and detector,
establish a flow of carrier gas and purge as recommended
by the column manufacturer.
17 Restore the analytical method.
For FID or FPD, immediately turn off the flame.
For NPD, immediately turn off the bead.
18 After the GC becomes ready, wait 10 minutes then ignite
the detector flame or bead.
19 Allow the oven, inlet, and detector to equilibrate at
operating temperature, then retighten the fittings.
20 Reset the column EMF counters. See To Reset an EMF
Counter in the Operation Manual.
WARNING
Be careful! The oven, inlet, and/or detector may be hot enough to
cause burns. If they are hot, wear heat-resistant gloves to protect
your hands.

Table of Contents

Related product manuals