EasyManuals Logo

Agilent Technologies Agilent 7890 Series User Manual

Agilent Technologies Agilent 7890 Series
354 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #226 background imageLoading...
Page #226 background image
226 Maintaining Your GC
11 Maintaining the FID
To Install the FID Insulation Cup Assembly (Adaptable FID Only)
1 Gather the following:
Insulation (See “Consumables and Parts for the FID”
on page 196.)
Insulation cup assembly
2 Load the GC maintenance method and wait for the GC to
become ready.
3 Assemble the insulation in the cup. Line up the slots in
the insulation with the slot in the cup.
Capillary columns should be attached to the detector
before installing the cup. When attaching a packed column
to the detector, cap the detector fitting before installing
the cup to prevent insulation contamination of the
detector.
WARNING
Be careful! The detector may be hot enough to cause burns. If the
detector is hot, wear heat-resistant gloves to protect your hands.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies Agilent 7890 Series and is the answer not in the manual?

Agilent Technologies Agilent 7890 Series Specifications

General IconGeneral
BrandAgilent Technologies
ModelAgilent 7890 Series
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals