Assembly and function
Cirrus 3/4/6000 DB2034 08.04
53
4.16 Pre emergence marker (Option)
When creating tramlines the pre emergence marker
(Fig. 75) automatically lowers into work and the marker
discs mark the just created tramline. In this way
tramlines are visible before the seed emerges.
Possible adjustments:
• Track width of the tramline
• Working intensity of the marker discs.
Fig. 75
The marker discs (Fig. 76) of the pre emergence
marker are lifted when no tramline is created.
Fig. 76