Settings
Cirrus 3/4/6000 DB2034 08.04
63
5.4.2 Calibration of the Cirrus with full electric metering
Calibration test on the Cirrus with full electric metering:
- Fill the seed hopper up to min. 1/3 of its volume with
seed (correspondingly less for fine seeds at fine
seeds.
- Take the seed collecting tray out of the transport
retainer on the hopper rear wall.
For transport the seed collecting trays are fitted into
each other and secured with a lynch pin (Fig. 95/1)
on the rear side of the seed hopper.
Fig. 95
- Slide the seed collecting tray (Fig. 96) into the
bracket.
Place one seed collecting tray underneath every
individual metering unit.
Fig. 96
- Open the injector sluice flap (Fig. 97/1) on all
metering units.
Danger!
Danger of squeezing
when opening and closing the injector
sluice flap (Fig. 97/1).
Only hold the injector sluice flap on its
strap (Fig. 97/2). Danger of injury when
the sprung loaded flap shuts (Fig. 97/1).
Never ever reach with your hand
between the injector sluice flap (Fig.
97/1) and the injector sluice.
Fig. 97