Putting to operation
Cirrus 3/4/6000 DB2034 08.04
95
Hints!
The supply tubing of the machine are
identified
(Fig. 139/1)
. The plugs of the
supply tubings are deposited in
retainers
(Fig. 139/2).
11. Create the hydraulic connections according to
chapter 7.1.1.1.
12. Create the hydraulic blower fan drive according to
chapter 7.1.1.2.
13. Create the electric power supply connections
according to chapter 7.1.1.3.
14. Create the air pressure connection of the brake
system according to chapter 7.1.1.4.
Fig. 139
Important!
Check the routing of the supply hoses.
The supply hoses have to be fitted in such a way
• that their natural placement and movement are not hindered when driving
round bends
• that they do not rub on foreign parts.
15. Prior to the first operation in the field drain the
compressed air reservoir (see chapter 10.4.1).
16. Check brake system and traffic light kit for proper
function.
17. Deposit the chocks in the retainers and secure by
using spring tensioners (Fig. 140/1).
18. Before transport carry out a brake test.
Fig. 140