EasyManua.ls Logo

APRILIA MXV 450 - Page 42

APRILIA MXV 450
216 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Place the new acoustic insulation ma-
terial (prepacked packets and materi-
al) in the upper and lower half-shells.
Apply liquid gasket for high tempera-
tures (at least 250°C) on the faying
surfaces between both half-shells.
Couple both half-shells being careful
not to pinch the acoustic insulation ma-
terial.
Fit in all rivets to get the correct posi-
tion, using TT Inox rivets, Ø 4.8x12.9,
rivet again both half-shells clockwise
.
Clean excess silicone after closing.
Replacing exhaust ends acoustic insulation material
CAUTION
BEFORE CARRYING OUT THE OPERATIONS DESCRIBED BELOW, WEAR A PAIR OF SAFETY
GLOVES
Maintenance MXV 450
MAIN - 42

Table of Contents

Related product manuals