8. Maintenance
Image 8-1
Types of reservoirs
Interval of the level check
The liquid level of the cooling system must be checked on a regular basis. This must be done by a trained and qualied technician.
The interval depends on the size of the reservoir.
It must be checked before rst use of the projector! Once the projector has been used before, the cooling liquid level must be
checked on every lamp change or every three months (small container) or every six months (big container) , whatever comes
rst. If the liquid level is not within the specications, cooling liquid must be added.