EasyManua.ls Logo

BeneVision N17 - Page 30

Default Icon
146 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-2
AG tests
Performance test
Calibration
Performance Tests
ECG tests
Performance test
1. If the user suspects that the measurement is incorrect.
2. Following any repair or replacement of relevant module.
3. At least once every two years. For CO
2,
AG and NMT modules, at
least once a year.
4. AG leakage test should be performed before AG measurement.
Calibration
Resp performance test
SpO
2
test
NIBP test
Pressure check
Leakage test
Temp test
IBP tests
Performance test
Pressure calibration
C.O. test
Mainstream CO
2
test
Sidestream and
Microstream CO
2
tests
Leakage test
Performance test
Calibration
AG tests
Leakage test
Performance test
Calibration
EEG test
BIS test
RM test
CCO/SvO
2
tests
Interconnecting function
Output calibration
NMT tests
Performance test
Sensor check
PiCCO test
Nurse call relay performance test
If the user suspects that the nurse call or analog output does not
work well.
Analog output performance test
EEG (self-made) test
Once every two years.
ANI test
Electrical Safety Tests
Electrical
safety tests
Earth impedance
1. Following any repair or replacement of the power module.
2. When the patient monitor is dropped.
3. At least every two years or as required.
Earth leakage test
Patient leakage current
Patient auxiliary current
Other Tests
Power on test
1. When first installed or reinstalled.
2. Following any maintenance or the replacement of any main unit parts.
Recorder check Following any repair or replacement of the recorder.
Network print test
1. When first installed.
2. Whenever the printer is serviced or replaced.

Table of Contents

Related product manuals