4-29
None.
Function Test
1. Verify that the patient monitor works properly when running on AC power.
2. Remove the AC power cord and verify that the patient monitor still works properly.
Performance Test
Perform the test procedure in the Battery section in the Operator's Manual and verify the operating time of the battery
meets the product specification.
4.12 Mounting Check
Tools required:
None.
4.12.1 Safety check
Check the mounting of Patient Monitor is safe.
4.12.2 Overall Test and Check of Installed System
Implement installation test:
The following tests and checks need to be performed after a patient monitor is installed, or reinstalled after being
disassembled and repaired:
Check that the screws fastening the bracket and guide rail are not loose.
Check that the five installation screws on the bottom side of the N12/M12 monitor are not loose.(six installation
screws for N15/M15 and N17/M17)
Check that the four installation screws on the transfer metal and monitor bottom side are not loose.
Check that it can be installed in place and locked when N12 monitor use fast lock installed way
Check that it can be installed in place and locked when the monitor use on the cart installed way
Check that the modules can be normally and securely inserted into the module rack.
Check that the trim strip is properly installed after the display is disassembled and repaired.
Check that the monitor handle is not loose.
Check that the VHM bracket can place the monitor at any height as required.
4.13 Factory Maintenance
4.13.1 Accessing Factory Maintenance Menu
Select Main MenuMaintenance (input the correct password)Factory Maintenance to open the Factory
Maintenance menu.