Getting Started 21
2.4 Preliminary Check
Complete the following steps to verify the Power supply is ready for use.
Verify AC
Input Voltage
Verify and check to make sure proper AC voltages are available to power the
instrument. The AC voltage range must meet the acceptable specication as
explained in section “2.1 Input Power and Fuse Requirements”.
Connect Power
& Self-Test
Connect AC power cord to the AC receptacle in the rear panel and press the
power button. It will run through a self-test procedure initially before booting to
the main screen.
After Power on, during the self-test, the following should be displayed:
Figure 2.2 Initializing
After the system scan is complete the LCD will display as shown in Figure 2.3
Note:
The initial power on state is based on the settings set on Power-ON
www.GlobalTestSupply.com
Find Quality Products Online at: sales@GlobalTestSupply.com