Contents
v
Cisco SCE8000 GBE Installation and Configuration Guide
OL-19897-02
Preventing Electrostatic Discharge Damage 4-3
Environmental Requirements 4-3
Power Requirements 4-4
Power Connection Guidelines 4-4
AC-Powered Systems 4-5
DC-Powered Systems 4-11
Site Planning Checklist 4-13
Installing the Cisco SCE8000 GBE Chassis in the Rack 4-14
Unpacking the Cisco SCE8000 GBE Chassis 4-15
Installation Guidelines 4-15
Required Tools 4-16
Installing the Chassis Brackets 4-16
Installing the Chassis in the Rack 4-17
Installing an Optical Bypass Module 4-19
Connecting the System Ground 4-20
Required Tools and Equipment 4-20
Installing the Power Supplies in the Cisco SCE8000 GBE Chassis 4-21
CHAPTER
5 Connecting the Management Interfaces 5-1
Introduction 5-1
How to Set Up the Local Console 5-1
Initial Setup Parameters 5-2
Connecting the Management Interface 5-4
How to Cable the Management Port 5-4
How to Verify Management Interface Connectivity 5-5
CHAPTER
6 Cabling the GBE Line Ports and Completing the Installation 6-1
Introduction 6-1
Connecting the GBE Line Ports to the Network 6-2
Single Cisco SCE8000 GBE Topologies 6-2
Dual Cisco SCE8000 GBEs Topology 6-3
The Optical Bypass Module 6-4
Optical Bypass Module Connectivity 6-5
Cabling the GBE Line Interface Ports 6-6
SFP Module Cabling and Connection Equipment 6-7
Optical Device Maintenance 6-8
How to Cable the GBE Line Interface Ports 6-9
Cabling the Line Interface Ports: Using the External Optical Bypass Module 6-9