EasyManua.ls Logo

CPI COTI - Page 118

CPI COTI
170 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Secon 6 - Service Keypad Funcons
6.1.5 Key 5 - View Counters
The View Counters or Data Recall buon enables the operator to access the Data Recall
Menu. Entry into this menu allows the operator to view Non-Reseable and Reseable
Sales Data, data relang to Timed Events, Idencaon Numbers of installed components
and (if the feature is enabled) view SureVendassisted vend data. The Reseable Sales
Data and SureVendData menus contain an extra sub-menu which allows the operator to
delete the current data from the machines memory. Refer to secon 5.3 Data Recall Menu
for full details relang to this menu and its contents.
6.1.6 Key 6 - Test Vend
The Test Vend buon enables the operator to vend a drink from the machine to ensure
correct operaon aer cleaning or maintenance.
Note: For LINEA standard drinks place cup under dispense nozzles before following the
below sequence. If vending hot water, place cup under hot water spout.
1. Press a drink selecon buon followed by the START buon to begin the vend
sequence.
2. Ensure that the selecon is correct, has not under/overlled the cup and most
importantly, tastes good!
3. Press the Up One Page or Cancel key on the drink selecon keypad to exit from the
Test menu and return to stand-by mode.
6.1.7 Key 7 - Cup Test
This buon enables the operator to test the operaon of the cup drop unit aer relling the
cup stacks. When the buon is pressed the cup drop motor is operated and a cup is ejected
from the cup drop unit. This funcon ensures that the mechanism is working correctly.
6.1.8 Key 8 - Park Head
When this buon is pressed, the dispense head moves to its fully extended posion and
stops. Press the buon again to return the dispense head to its home posion.
6.1.9 Key 9 - Boiler Fill (Espresso Machines)
When this buon is pressed the machine will purge all the water from the pressure water
system by replacing it with fresh water, it will dispense approximately 900ml. This buon
should be used to purge any water le in the system aer the machine has been moved or
shut down for any length of me or if there is an air lock in the closed loop system i.e. aer
an install, a new water lter ed or the machine has been serviced.
Warning: ensure there is a suitable container in posion to catch the water being
dispensed Also be aware this water may be hot.
6.1.10 Key 10 - Machine Cool Down (Espresso Machines)
Machine Cool Down or Boiler Cool Down enables an engineer to work safely on the Espresso
module.
When this buon is pressed the hot water in the pressure system is replaced by 500ml of
cold water. When complete, the message Machine Cooledis displayed and all outputs will
108

Table of Contents

Related product manuals