Secon 5 - Engineer’s Program
Technical Manual
5.5.2.1 Valves
Use this opon to test the operaon of each individual dispense valve ed to the main
gravity heater tank. During this test the dispense head moves to its fully extended posion.
1. Select the valve required.
2. Water will be dispensed from the heater tank during the test sequence. Place a
suitable container under the dispense posion and on compleon empty the contents
of the container.
Note: In this test the valves are each energised for 4 seconds allowing an accurate
calibraon of volume via the restrictor on the valves.
Important: Ensure there is a suitable container in posion to catch the hot water
dispensed during the test.
5.5.2.2 Pumps
Use this opon to test the correct operaon of the syrup pumps if ed.
1. Select the required pump.
5.5.2.3 Augers
Use this opon to test the operaon of each of the ingredient motors. As this test causes
the ingredient canister auger to turn you should remove the canisters before starng the
test sequence. Each motor will run for 4 seconds.
Important: DO NOT place ingredient canisters on the oor.
1. Selecng Tesng will run each auger in turn, selecng Abort will stop the sequence.
2. Select an individual Auger if that opon is preferred
3. Ret the ingredient canisters on compleon of the test.
5.5.2.4 Whippers
Use this opon to test the correct operaon of each of the individual whipper motors, each
motor is run for 4 seconds.