EasyManua.ls Logo

Daedong EX50-SA - REMOVAL AND INSTALLATION OF 3-POINT HITCH IMPLEMENT (WITH PTO SHAFT)

Daedong EX50-SA
196 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
-
2
EX50-SA / EX55-SA / EX5310-AU / EX5810-AU
REMOVAL AND INSTALLATION OF 3-POINT HITCH IMPLEMENT (WITH PTO SHAFT)
1. Drive the tractor backward to move
close to an implement (approx. 5
cm). Then, adjust the height of the
lower link to be parallel to the pins
of the implement.
2. Put all the shift levers in the neu-
tral position, stop the engine, and
apply the parking brake.
H11O562A
(1) Implement Support (1) Telescopic Stabilizers Pin
H11O567A
3. Remove both of the Telescopic
Stabilizers xing pins.
(1) Latch (2) Lower Link End
H11O564A
4. Press the latch to pull out the low-
er link end (cassette type).
When removing/installing an
implement, remove the check
link pin to use the lower link
end (cassette type) effectively.
IMPORTANT
TE150 (EX50, EX55)-���-06.indd 2 2019-03-19 �� 2:31:30

Table of Contents

Related product manuals