6
-
11
3-POINT HITCH IMPLEMENT OPERATION
HANDLING LOADER
(1) Loader Mounting Bracket
(2) Balancing Cylinder
(3) Loader Arm
(4) Boom
(5) Grill Guard
(6) Tilt Cylinder
(7) Bucket
For detailed information about instal-
lation and use of the front loader,
refer to the separate manual of the
loader.
Check the transmission fluid
level and add fluid as neces-
sary after installing an imple-
ment related to the hydraulic
uid, such as a loader or back-
hoe, and driving the tractor for
a test.
IMPORTANT
TE5O604A
TE150 (EX50, EX55)-���-06.indd 11 2019-03-19 �� 2:31:34