EasyManua.ls Logo

Diamond DA20-C1 - Winterization Kit and Preflight Inspection; Winterization Kit and the Airplane Performance; Winterization Kit and Weight and Balance

Diamond DA20-C1
268 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DA20-C1 Flight Manual
Supplement 2
Doc # DA202-C1 April 16, 2009 Page S2 - 3
3. EMERGENCY PROCEDURES
There is no change to the airplane emergency procedures when the Winterization Kit is
installed.
4. NORMAL PROCEDURES
4.4.1. Preflight Inspection:
[Insert after Item 7 (c) of the Walk-around inspection (refer to section 4.4.1 of the Airplane Flight
Manual)]
Install or remove winter kit baffles according to the following chart:
5. PERFORMANCE
There is no change in airplane performance when the Winterization Kit is installed.
6. WEIGHT AND BALANCE
The effect of the Winterization Kit on weight and balance is negligible.
Revision 24 DOT Approved

Table of Contents

Other manuals for Diamond DA20-C1

Related product manuals