SC-F2000 Revision C
DISASSEMBLY & ASSEMBLY Disassembly and Assembly Procedure 120
Confidential
9. Insert A part and E part of the film (1) in the space of the CR UNIT along the FFC.
Figure 3-78. Attaching the film (1) (7)
10. Check that the screw of the DAMPER KIT and screw hole of the film (1) are at the
same position.
11. Connect the FFC to the connector (CN100) of the CR SUB BOARD.
12. Install the sponge (6) in the Damper Kit against the cams of the APG shaft.
Figure 3-79. Installing the film (1) (8)
Insert the A part of the film (1) inside E part of the film (1).
FFC
E part
CR UNIT
A part
A part E part
APG shaft
Upper side
Screw and screw hole
Cam Cam
Sponge (6)
Film (1)
DAMPER KIT
CN100
FFC
CR SUB BOARD