EasyManua.ls Logo

FAAC A1400 AIR RDT - 6. Head Section Assembly

FAAC A1400 AIR RDT
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A1400 AIR RDT 21 532119 04 - Rev. C
30
200 200
30 30
37,5
5
1
8
15
Nm
2
6
6
Nm
2
1
117
1
55
40
45
Translation of the original instructions
ENGLISH
6. ASSEMBLE THE HEAD SECTION
1. Fasten the support profile to the self-supporting profile 5-
:
- start fastening at a vertical slot at one end and a horizontal slot
at the other end.
Check the horizontal with a spirit level.
- proceed with the other fastenings at a 200 mm distance; alternate
vertical and horizontal slots.
2. Fasten the side brackets at the ends:
- position the plates in the suitable housings and fasten the 2 side
brackets at the ends of the supporting profile and self-supporting
profile 5-
.
use the screws and the plates supplied
In case of A1400 AIR RDT KIT supply, the components must be fitted
onto the support profile. This operation is performed in the shop.
The assembled head section is then moved to the installation site.
Handling instructions at 19.
RISKS
PERSONAL PROTECTIVE EQUIPMENT
REQUIRED TOOLS
Ø 18 mm
6-8-10-13 5
!
A torque wrench must be used to achieve the specified fastening
torques (Nm).
For manual lifting, arrange for an adequate number of people for the
weight of the leaf: 1 person every 20 kg to be lifted.
6.1 PRELIMINARY FOR SELFSUPPORTING
HEAD SECTION (if any)
ONLY in cases where the head section is to be fastened to the side
walls, the self-supporting head section must be prepared:
the support profile, self-supporting profile and the side brackets are
assembled before assembling the automation components.

Table of Contents

Related product manuals