A1400 AIR RDT 28 532119 04 - Rev. C
25
24
Translation of the original instructions
ENGLISH
ASSEMBLING THE FRAME
The supply includes:
- 4 leaves (2 fixed leaves and 2 mobile leaves with installed glazing).
- side and upper balancing profiles
- alignment profile
- fixed leaf beading
- floor shoe
1. Mount the upper balancing profile 24-
.
2. Mount the side balancing profiles 24-
.
3. Mount the floor profile 24-
.
4. Insert the fixed leaf by tilting it and inserting it into the top profile
25
.
5. Place horizontally then fasten the leaf.
6. Mount the upper labyrinth 25-
.
MOUNTING MOBILE LEAVES
Mount the leaves as described § 9 32.
ASSEMBLY OF THE HEAD SECTION TO THE UPPER
PROFILE
Mount the assembled head section onto the upper profile by means
of suitable attachments.
After mounting the head section, perform all procedures to secure the
leaf to the carriages as set out in the chapters concerning kit assembly.
Refer to chapter § 8 29 also for all adjustment procedures.
Automation side view
fixed leaf
mobile leaf