Translation of the original instructions
ENGLISH
8. INSTALL THE HEAD SECTION
Screws and dowels not supplied.
8.2 WALL FASTENING
!
The supporting wall must be adequate for the weight of the entry
door (automation with leaves). It is recommended to use dowels with
adequate screws and tightening torque.
1. Lift the support profile to the established fastening height.
2. Mark the drilling points on the wall.
!
Check the horizontal with a spirit level.
3. Drill the holes on the wall.
- Use suitable drill bits for the wall material.
4. Lift the support profile. Start fastening at a vertical slot at one end
and a horizontal slot at the other end.
!
Check the horizontal with a spirit level.
5. Fasten in the middle then proceed with the remaining attach-
ments alternating vertical and horizontal slots at a distance of
200 mm 26.
Upon completing head section installation, reposition the compo-
nents you have moved and reassemble the electronics module in
the correct position.
Finally, fit again the safety cables and the casing.
RISKS
PERSONAL PROTECTIVE EQUIPMENT
REQUIRED TOOLS
Ø 8 mm
8-10-13
5
For manual lifting, arrange for 1 person every 20 kg to be lifted.
8.1 PRELIMINARY OPERATIONS
1. To be able to perform fastenings, the casing and electronics mod-
ule must be temporarily disassembled and the components must
be moved as they are a hindrance.
To make subsequent replacing easier, mark components’ positions.
- With the automation on the ground, extract the safety cables
and remove the casing.
- Loosen the screws of the electronics module and remove it.
- Loosen the screws of the components that are a hindrance (e.g.
motors) and slide them along the profile.
2. Establish the fastening height of the support profile:
- for leaves with 2.5 m standard height frame consider overall
dimensions of 104 to 107
!
The minimum distance between the upper section of the support
profile and the ceiling must be 80 mm 26.
Check the horizontal with a spirit level.
3. Continue according to the intended type of installation:
- WALL FASTENING 29.
- SELFSUPPORTING FASTENING with OPTIONAL ACCESSORY
PROFILE 30 - if provided for specific needs.
ceiling