EasyManua.ls Logo

FieldServer LonWorks ProtoNode - Page 15

FieldServer LonWorks ProtoNode
97 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 15 of 97 PN: 106417-05
Universal Gateway
EMS
TSBC
Control System
Bacnet or
Lonworks
Local /Remote
Contact
(OPTIONAL)
(Typical for each boiler)
RJ 11
Phone
Cable
Local /Remote
Contact
(OPTIONAL)
RJ11
Connects
up to 8
Boilers
Boiler 1
RJ11
2 port RJ11
Splitter
(Not Included)
TSBC
Control System
Boiler 2
LR
C
LR
C
2 port RJ11
Splitter
(Not Included)
Note: Connect wires to
ProtoNode as shown on
previous page.
Figure 3-6: Multiple TSBC/SBC Modbus RS485 Wiring
IMPORTANT NOTES for TSBC Connections:
1. When controlling Setpoint with the EMS, the user does not have access to Enable/Disable, and Lead Lag.
User must do a contact closer to RO & C on each boiler. When controlling Modulation, user does have access
to Enable/Disable, and Lead Lag.
2. When the EMS is connected, boiler sequencing (Multiple Boiler Lead/Lag) must be done external to the Boiler
Control by other means.
3. Boiler Enable/Disable and Firing Rate are sent over the ProtoNode or may be directly wired.
1. When the Energy Management system is connected, boiler sequencing (multiple boiler lead/lag) must be done external to the boiler controls, by other means.oiler enable/disable and firing rate are sent over the Universal Gateway or may be direct wiring.

Table of Contents

Related product manuals