Panda xControl
Seite/Page 236 - Kaptitel/Chapter 11: Panda xControl 18.12.15
11.5.4.3 Set up the operation mode for the opt. DC-Power (DP) output of the CP-G
Fig. 11.5.4.3-1: Submenu „operation model“
11.5.4.4 Set up the follow-up time for the opt. DP output of the CP-G
Fig. 11.5.4.4-1: Submenu „follow-up time“Increase /decrease with the „Step-up“/“Step-down“ buttons
the value and confirm with the „Start/Stop - Enter“ button.
Choose cancel or confirm with the „Step-up“/“Step-down“
buttons and confirm with the „Start/Stop - Enter“ button.
11.5.4.5 Switch the outputs of the CP-G
Scroll with the „Step-up“/“Step-down“ buttons to the menu point „switch outputs“ and confirm with the „Start/Stop -
Enter“ button. You enter the menu point switch outputs.