Maintenance and care
111
• Lock the print heads:
Turn the two blue-green levers down-
wards.
• Take hose coupling of the hose connection
marked with
L from stand-by position.
• Put hose coupling in left print head and
push in firmly. Feel the coupling lock in
place.
• Take hose coupling of the hose connection
marked with
R from stand-by position.
• Put hose coupling in right print head and
push in firmly. Feel the coupling lock in
place.