4.1 Test Run Procedure Flowchart
4-1
4.1 Test Run Procedure Flowchart
Make a test run of the motor using the flowchart given below.
This chapter describes the test run procedure with motor 1 dedicated function codes that are marked with an
asterisk (*).
When motor 2 to 4 is used, it is necessary to convert to the corresponding function codes.
These function codes are marked with “*.”
For the function codes to be converted, see Chapter 5 “FUNCTION CODES.”
Switching of applicable motor rank
(F80 (HHD, HND)
Power ON and check
after power ON
Check prior to power ON
Mounting, installation, wiring,
switch settings
Motor control method selection
Run check
Frequency command selection
Run command selection
End
(perform full operation)
Start
Destination setting
Flow for replacement from conventional models
Power ON and check
after power ON
Check prior to power ON
Mounting, installation, wiring,
switch settings
Run check
End
(perform full operation)
Start
Function code setting when
switching from conventional model
Fig. 4.1-1 Test run procedure