EasyManua.ls Logo

Furuno INMARSAT-C FELCOM 18 - How to Show the PV Test Results

Furuno INMARSAT-C FELCOM 18
179 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10. MAINTENANCE AND TROUBLESHOOTING
10-4
3. The [Start] window appears and [Yes] is selected; press the Enter key to start the
test. The [PV Test] screen appears and shows the message "Starting PV Test
Process. Press any key to escape."
Note: If the terminal unit is not idle when the test is initiated, the screen displays
"Ignored: MES is not idle."
4. Long-press the Esc key to return to the standby display.
5. The (automatic) testing sequence is as follows:
1) The screen displays "Current State: IDLE (PENDING)" when you receive the
acknowledge signal from the NCS.
2) When preparations for testing have been completed, "Current State: TEST-
ING" appears at the bottom of the screen. Further, the message "Automatic
test mode: Normal communication disabled. Do not press any distress button
unless you are in distress." appears.
3) Receive a message from the LES. Send a test message to the LES.
4) Then, the distress alert test is automatically conducted after you have sent a
test message. Do not operate the equipment at this time.
5) When testing has been completed, "Current State: IDLE" appears at the bot-
tom of the screen.
10.3.3 How to show the PV test results
1. Press the F7, 8 and 2 keys to show the PV test results.
2. Long-press the Esc key to return to the standby display.
How to read the PV test results
Test Date & Time: Date and time of test
Attempts: Number of times the PV test was conducted.
BBER: Bulletin Board Error Rate (%). "Pass" appears for no error.
Shore-to-Ship Attempts: Number of tests initiated by LES.
Ship-to-Shore Attempts: Number of tests initiated by MES.
Distress Alert: "Pass (Test OK)" appears for successful testing.
Signal Strength: "Pass" appears if signal strength is greater than standard level.
Overall Result: "Pass" appears for satisfactory completion of the test.
Test Date & Time
Attempts
BBER
Shore-to-Ship Attempts
Ship-to Shore Attempts
Distress Alert
Signal Strength
Overall Result
02-02-25 01:58 (UTC)
First attempt
Pass
First attempt
First attempt
Pass (Test OK)
Pass (Greater than Std level + 10dB)
Pass (Applicable tests pass)
Ctrl+P: Print ESC: Quit
PV Test Result

Table of Contents

Related product manuals