Rack and pinion hoist
Assembly and Operating Instructions
76 / 100 BL108 GB Edition 03.2018 Rev. 02
Safety gear passed
Further travel is not possible once the safety gear has been triggered.
Resetting the safety gear
Loosen the two central opposing locking screws (1).
Turn the driver disc (2) clockwise until the actuating lever (3) for the
limit switch engages in the groove in the driver disc (2).
Tighten the two screws (1).
Continue with check safety gear for damage.
Drop test not successful
WARNING
Risk of injury
Immediately replace the safety gear. Operation of the
machine is prohibited until then.
Use the ground control (manual control) and move the platform to the
ground station.
Press the DOWN button (8) and lower the load platform.
Switch off the machine at the main switch and secure against
switching on.
Inform operating company, clarify further procedure.