Operation
Printed in U.S.A. 113 50940411/G0219
3. Tilt the bucket forward so it stands on the cutting
edge (Fig. 115).
4. Drive in reverse, dragging the floating bucket.
Adjust the tilt angle of the bucket while driving
in reverse to control the spread of the material.
5. When finished, press button (A, Fig. 116) again
to deactivate the lift arm float.
Backfilling
1. Lower the bucket a few inches from the ground
(Fig. 117). Slowly drive up to the hole until the
front edge of the bucket is over the near edge of
the hole.
2. Tilt the bucket forward to dump material into the
hole.
3. Tilt the bucket back and raise the bucket. Inspect
the hole for proper filling.
4. Continue to dump material into the hole as
necessary for proper fill.
Fig. 116 – Lift Arm Float Buttons/Indicator
A
A
B
Fig. 117 – Backfilling
1
2
3
4