Préparation du site
1. Power considerations are shown in the following table:
Option Description
AC power
◦ Ensure a suitable circuit breaker is in-line between the device and the
power source.
◦ The main power supply must be installed by a qualified electrician,
according to power authority regulations. Make sure all powering is wired
with an earth leakage, according to local regulations.
◦ It is recommended to install the device within 1.5m (approximately 5feet)
from an easily accessible grounded AC outlet.
DC power
◦ Ensure a suitable circuit breaker is in-line between the device and the
power source.
◦ Connect DC-input power supplies only to a DC power source that
complies with the product's DC powering specifications.
◦ Ensure that power is removed from the DC circuit before installing or
removing power supplies.
2. Handling fiber channel cables:
◦ Always read and comply with the handling instructions on the shipping container.
◦ Follow all ESD precautions and approved fiber cleaning procedures.
◦ The fiber is made of a very pure, expensive glass and should be treated with great care. Handle
fibers only in areas that are very clean and do not contain sharp objects.
◦ Wear finger cots or gloves as dirt and oils can damage the fiber and contaminate connectors.
◦ Do not allow kinks or knots to develop in the fiber. If tangles occur, carefully work out the tangles
avoiding pulling or bending the fiber beyond its bend radius.
◦ Always use the correct tools for stripping and cleaving the fiber. It will save time and reduce
breakage caused by scratches.
◦ If you must secure a bundle of fiber cables together, avoid plastic and metal tie wraps; secure with
Velcro instead.
3. Disposing of the unit:
◦ Dispose of the unit and its components (including batteries) as specified by all national laws and
regulations.
Préparation du site
Préparez le site réservé à l’équipement en vue de son installation et utilisation.
NOTE: REMARQUE : seul du personnel de maintenance formé et qualifié (tel que défini dans
les normes IEC 60950, IEC 62368 et AS/NZS 3260) doit être autorisé à réaliser l’installation, le
remplacement ou la maintenance de l’équipement. Si vous vous trouvez aux États-Unis, installez le
système conformément aux normes NEC (National Electrical Code).
IMPORTANT: REMARQUE : Préparez le site pour une installation en toute sécurité
conformément aux règles de sécurité locales, à l'environnement d'installation et aux
spécifications du produit.
115 Installation Guide