3. Confirm whether the Fault LED on the replaced HDD is blinking. When the
rebuild is in progress on the HDD, the Fault LED blinks in amber.
Figure 6-10 Fault LED
4. Enter hrncli -ldpdprog in the root@localhost:~/desktop window, and
then confirm the progress of the rebuilding.
(The PD No in the window corresponds to the HDD number in the server
blade or storage expansion blade.)
6-8
Identifying RAID rebuild status
Hitachi Compute Blade 500 Series System Service Manual