Figure 4-46 Antenna cable routing
3. Connect the antenna cable to the antenna port on the ECC800-Pro.
Figure 4-47 Installing an antenna cable
----End
4.2.6.2 Installing a PAD
Context
The PAD is to be installed on the front door of the cabinet.
FusionModule500 Smart Mini Data Center
User Manual 4 Installation Guide