Figure 5-3 Charging refrigerant
(1) Refrigerant cylinder (2) Electronic balance (3) Pressure gauge
(4) Connection nut (5) Gas pipe needle valve (6) Liquid pipe needle valve
----End
Exception Handling
Step 1 Check that the T/H control mode and T/H set point are properly set.
Step 2 Check that the current time is correctly set.
Step 3 Check that the return air lter is installed in the correct direction.
----End
5.3 Management System Power-On Commissioning
5.3.1 Preparations and WebUI Login
Prerequisites
● Supported operating system: Windows 7 and later versions
● It is recommended that the screen resolution be 1366 x 768 or higher.
● Browser: Chrome, Firefox, Internet Explorer 11 or later
Procedure
Step 1 Connect a network cable between the PC network port and the WAN1 port
(protected by a security mechanism) on the ECC800-Pro.
FusionModule500 Smart Mini Data Center
User Manual 5 Power-On Commissioning
Issue 02 (2020-12-25) Copyright © Huawei Technologies Co., Ltd. 161