8-10 Working with Master/Slave
ICE Vulcan Service Manual
3
Enter an identification name for the LPA in the name field.
These names can be viewed on the screen of the Master LPA user
interface and are useful
for identification purposes. Names can be
edited from the default values of 'LPA 1… LPA
4', if required e.g.
'Master…. Slave 1'
Note: The 'Check boxes' on the left hand side of the dialog box indicate how
many Slaves are to
be connected.
4
Click on the check boxes to select the slave LPAs. The dialog box
allows only the selection
of consecutively-numbered Slaves starting
with Slave 1.
5
Select either Group Job Select or Group Control from the Master/
Slave level drop -down
box (refer “Master/Slave Terminology” on
page 8-2).
When at least one Slave is enabled and a Master/Slave level has been
selected, the 'OK' button
becomes available.
6
Click OK button, to program the LPA with the selected configuration.
Connecting the LPAs Together
To connect the LPAs proceed as follows:
1
If the LPAs are not already connected, they may be connected
together as described
“Physical Installation” on page 8-3.
After a few seconds any Faults and/or Warnings messages on the
Master and Slave LPAs
becomes 'clearable' indicating that all
connections have been successfully made.
2
If any Faults/Warnings can not be cleared, switch off and on the slave
LPA concerned.
3
If a problem persists, repeat the previous configuration steps to
ensure the master has
been configured with the correct number of
slaves and that no slaves have been assigned
with the same LPA
number.
4
If operating under 'Group Control' mode, any Faults and/or
Warnings present on the Slave
LPAs is reported on the Master LPA
user interface screen, then they must be cleared at the
Master LPA.