EasyManua.ls Logo

Ice vulcan - Setting up the Production Line

Default Icon
252 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-10 Installing the Label Applicator
ICE Vulcan Service Manual
Setting up the Production Line
12
Position the label applicator and the stand adjacent to the conveyor.
Use the height adjustments on the stand to position the printhead and
the
peel tip so that the label will be applied at the correct vertical
location on the
box.
Figure 4-7: Labeller on Line

Table of Contents