98
BoomLiftModels X20JPLUS
USINGTHEMACHINE
MUX20JP021602
Aftertheconditionsdescribedabovehavebeenchecked,makesurethereareno
obstaclesintheworkingareaoftheJIBboom,andproceedasfollows:
•Use joystick 6 to move the JIB boomʺFig. 53 Joystick controls(p. 60)ʺ. If
anotherjoystickisused,anerrormessagewillbeshownonthedisplay:
• Afterpass
ingtheinclinethatrequiredthejibarmtobeopened,returnthe
machinetotheclosedconfigurationtocontinuetravelling.
•WiththeJIB boomraised always travelat minimumspeedandkeepthejib
armasclosetothegroundaspossible.
•DONOTtraveldownhilliftheJIBboomisnot completelyfold
ed.
11.4.8.Parkingthemachineonaslopeoronunevenground
Whenparkingthemachineonaslopeorunevengroundwiththestabilisersclo‐
sed,makesurethatthecarriageisintheopenpositionandblockthetracksusing
chockstopreventthemachinefrommoving.
11.4.9.Stabilisingandlevellingth
emachine
Oncehavingdecidedwheretoparkthemachine,thiscanbestabilisedandlevel‐
led. First of all check that the surface can support the pressure exerted on the
groundbythemachine,seetheparagraphʺTechnicaldata (p. 19)ʺ,andcancon‐
taintheoveralldimensionsofthemachin
ewithstabiliserslow ered.
Fig.90 ErrorJIBONLY
Stabilisingthemachineonaslopeexceedingtheallowedlimitsmay
causeinstabilityandconsequentlyharmtoorevendeathofopera‐
tors or other persons in and around the working area. Work must
onlybeperformedwiththemachinestabilisedataninclinationun‐
dertheli
mitsspecifiedbythemanufacturer.